Warning: session_start(): open(/var/cpanel/php/sessions/ea-php74/sess_bdd3cf88f1522892930e99456c8f1a0b8b8c4aeece9b385f, O_RDWR) failed: No space left on device (28) in /home/devwehrmacht/public_html/forums/includes/vb5/frontend/controller/page.php on line 71 Warning: session_start(): Failed to read session data: files (path: /var/cpanel/php/sessions/ea-php74) in /home/devwehrmacht/public_html/forums/includes/vb5/frontend/controller/page.php on line 71 The Roland Gunner-Medal - Wehrmacht-Awards.com Militaria Forums
FlandersMilitaria

Announcement

Collapse
No announcement yet.

The Roland Gunner-Medal

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    The Roland Gunner-Medal

    Gentlemen,

    A small, and not often seen in wear, is the Roland "Gunner-Medal". It is referred by this name in the Bundeswehr. Only a small number of soldiers could wear this small badge on their beret. You had to have actually fired a Roland missile and the "medal" was given to these individuals by the company that produced the Roland. Whether the company actually presented the "medal" is not known by me. It may have been presented by a member of the Bundeswehr.
    There are three articles below which refer to the "Gunners-Medal" and the Roland system.
    1-A translation of document sent to me by a member of the Bundeswehr, Udo Mumm, who could wear this "medal"'
    2-A translation from Kunstwadl's book, page 162 on the "Gunner-Medal"
    3-An English WIKI article on the Roland Weapon System.

    Regards,

    Gordon

    The Roland Weapons System mounted on a Marder of the Bundeswehl and its weapon.
    Attached Files

    #2
    Article #1,
    Die “Gunner-Medal”

    Dieser Anstecker ist eine inoffizielle nach außen sichtbare Auszeichnung, die am korallroten Barett der Heeresflugabwehrtruppe getragen wird. Alle Soldaten, die an einem Shcießen mit dem Flugabwehrrakettenpanzer Roland teilnahmen, haben diesen Anstecker “verlleihen” bekommen. Seit dem ersten Schießen 1980 bis zum letzten Schuss auf der griechischen Mittelmeerinsel Kreta 2005 wurden alle Kommandanten, Richtkanoniere und Panzerfahrer, als Besatzung des FlaRakPz Roland, damit ausgezeichnet. Die Firmen, die zur Herstellung des Lenkflugkörpers zeichen, haben diese “Gunner-Medal” als Dank entworfen und zur Verfügung gestellt.

    Das Emblem ist auf einem Blitz aufgebaut, der symbolisch die Datenfunkverbindung zwischen Panzer und Lenkflugkörper darstellen soll und auf einer blauen Grundfarbe basiert. Der Schriftzug bezeiht sich auf das FlaWaSys Roland und in der Mitte ist der Lenkflugkörper (LFK) erkennbar.


    Die Bundeswehr hatte im Heer 147 Roland-Panzer

    Hier Auszug aus Wikipedia unter Heeresflugabwehrtruppe

    Die Entwicklung des Waffensystems Roland begann als bilaterales Technologie-Vorhaben in Umsetzung der im Elysée-vertrag von 1963 vereinbarten militärischen Kooperation zwischen Deutschland und Frankreich mit einem Regierungsvertrag vom Oktober 1964. Industrieseitig bildeten die deutsche Messerschmitt-Bölkow-Blohm (MBB) GmbH in Ottobrunn und die französische Aérospatiale S.A. in Chatillon die gemeinsame Managemetfirma Euromissile G.I.E. in Fontenay-aux-Roses, die als Generalunternehmer Vertragspartner der beiden Länder wurde. Amtsseitig wurden auf der Ebene Verteidigungsministerien ein Direktions- und Lenkungsausschuß gebildet und als ausführende, koordinierende Behörde 1969 das Bureau de Programmes Franco-Allemand (BPFA) in Rueil-Malmaison aufgestellt.

    FkaRakPaz 1 ROLAND II (Prototyp, 1977)

    Die Entwicklung und Serienreifmachung des Waffensystems war jedoch wegen der Komlpexität des Systems zeitraubender und kostspieliger als ursprünglich geglant, insbesondere als nach umfangreichen bi- und trillateralen Erprobungskampagnen zahlreiche Modifikationen zur Härtung gegen elektronische Störmaßnahmen eingeführt wurden. Besondere Maßnahmen waren auch bei der Herstellung der Versorgbarkeit, der Bereitstellung von Instandsetzungsausstattung, Meß-und Prüfmittel sowie der Verfügbarkeit von Ausbildungsgeräten Einsatz erfolgte die Ausstattung der Heeressverbände ab 1981 paralell zur Restentwicklung und Einführung logistischer Anteile. Für Luftwaffe und Marine wurde das Waffensystem in einem Shelter integriert, jedoch musste zunächst auf die Einführung nach Prioisierungen einer Rüstungsklausur verzichtet werden. Die Einführung der FlaRakRad konnte erst ab 1987 realisiert werden, nachdem mit den USA 1983 eine kooperative Beschaffung von Waffensystem Patriot und Roland vereinbart worden war. Dieser deutsch/amerikanische Vertrag war auh die Grundlage für die Entwicklung des Flugabwehrgefechtsstand Roland (FGR),der 1988 eingeführt wurde.

    1984 begannen erste Arbeiten zur Definition und Entwicklung einer Kampfwertsteigerung (KWS) mit den Schwerpunkten der Einführung eines Infrarot-/Laser-Visiers, einer verbesserten System-Logik und eines leistungsgesteigerten Flugkörpers. Als 1992 jedoch nach den sicherheitspolitischen Veränderungen erkennbar wurde, dass die Beschaffung aller KWS-Anteile nicht finanzierbar sein würde, würde das Vorhaben auf eine Nutzungsdauerverlängerung (NDV)
    reduziert.

    Im Frühjahr 1991 konnte eine Verlegung von FlaRakRad der FlaRakGrp 42 in die Türkei zum Schutz dortiger Nato-Basen nur unter Großen Schwierigkeiten erfolgen. Dies führte zur kurzfristigen Entwicklung eines in Transall C-160 transportierbaren Sonderaufbaus (FlaRakRad lvb), der ab 1994 durch Umrüstung vorhandener FRR eingeführt wurde.

    Wegen der veränderten Bedrohungslage, der sich abzeichenenden neuen Einsatzprioritäten der Bundeswehr und der daraus resultierenden Strukturveränderungen wurden jedoch auch die NDV-Maßnahmen bis zur Ausphasung der Systeme bei den drei Teilstreitkräften ab 2002 nur teilweise realisiert. Während die Roland-Waffesysteme der Luftwaffe 2003 im Vorgriff auf das noch in der Entwicklung befindliche Medium Extended Air Defense System (MEADS) außer Dienst gestellt wurden, endete 2005 die Nutzung des Waffensystemes Roland auch in Heer.

    Persönlich kann ich sagen das 22 Jahre am und mit dem Systeme eine interessante und prägende Zeit war. Schießplatzaufenthalte in den USA, Frankreich und Griechenland sind unvergessene Erlebnisse. Obwohl die Trupengattung der Heeresflugabwehr mit Ablauf diesen Jahres aus der Bundeswehr verschwindet trage ich noch immer mit Stolz das Barett und die “Gunner-Medal” und hoffe das Ihr Exemplar in gute Hände gelangt.

    Mit freundlichem Gruß Udo Mumm


    The "Gunner-Medal"

    This badge is an unofficial outward-visible award worn on the coral red beret of the Army Air Defence. All the soldiers who participated in a shoot with the anti-aircraft tank Roland, have this badge "loaned" to them. Since the first shooting in 1980 until the last shot on the Greek Mediterranean island of Crete in 2005, all commanders, gunners and tank drivers, as crew of the FlaRakPz Roland, have been awarded it. The companies signing for the production of the guided missile have designed and provided this "Gunner-Medal" as a thank you.

    The emblem is based on a lightning bolt symbolizing the data communication between the tank and the guided missile and is on a blue base colour. The lettering refers to the FlaWaSys Roland and in the middle of the guided missile (LFK) is recognizable.

    The Bundeswehr had 147 Roland tanks in the army

    Here is an excerpt from German Wikipedia under army anti-aircraft defence

    The development of the weapon system Roland began as a bilateral technology project in the implementation of the 1961 agreement in the Elysée Treaty of military cooperation between Germany and France with an intergovernmental agreement in October 1964. The German Messerschmitt-Bölkow-Blohm (MBB) GmbH in Ottobrunn and the French Aérospatiale SA in Chatillon the joint management company Euromissile G.I.E. in Fontenay-aux-Roses, which became a general contractor of the two countries. On the official level, a Steering Committee was formed at the level of Ministries of Defence, and in 1969 the Bureau de Programes Franco-Allemand (BPFA) was set up as the executive coordinating authority in Rueil-Malmaison.

    FkaRakPaz 1 ROLAND II (prototype, 1977)

    However, because of the complexity of the system, the development and mass production of the weapon system has been more time consuming and costly than originally envisioned, especially as numerous modifications to counteract electronic interference have been introduced after extensive bi- and tri-lateral testing campaigns. Special measures were also in the production of the ability to supply, the provision of repair equipment, measuring and testing equipment and the availability of training equipment use the equipment of the Army Associations took place from 1981 parallel to the residual development and introduction of logistics units. For the Air Force and Navy, the weapon system was integrated in a shelter, but first had to be dispensed with the introduction after prioritization of an armaments exam. The introduction of the FlaRakRad could be realized only from 1987, after a cooperative procurement of weapons system Patriot and Roland had been agreed with the USA in 1983. This German / American contract was also the basis for the development of the air defence command post Roland (FGR), which was introduced in 1988.

    In 1984, the first work on the definition and development of a combat value increase (KWS) began with the emphasis on the introduction of an infrared / laser sight, an improved system logic and an up-rated missile. However, in 1992, after the security policy changes, it became apparent that the procurement of all KWS shares would not be affordable, the project would be extended to a useful life extension (NDV) reduced.

    In the spring of 1991, a transfer of FlaRakRad FlaRakGrp 42 into Turkey to protect Nato bases there was only with great difficulty. This led to the short-term development of a special transportable in Transall C-160 (FlaRakRad lvb), which was introduced in 1994 by retrofitting existing FRR.

    However, due to the changed threat situation, the Bundeswehr's new mission priorities and the resulting structural changes, the NDV measures until the systems were phased out by the three armed forces from 2002 were only partially realized. While the Luftwaffe's Roland weapon systems were decommissioned in 2003 in anticipation of the still-evolving Medium Extended Air Defense System (MEADS), in 2005 the use of the Roland weapon system also ended in Heer.

    Personally, I can say that 22 years on and with the systems was an interesting and formative time. Shooting-range stays in the USA, France and Greece are unforgettable experiences. Although the army air defence branch of service disappears from the Bundeswehr with expiration of this year, I still carry with pride the beret and the "Gunner-Medal" and hope that your copy gets into good hands.

    With kind regards Udo Mumm

    Comment


      #3
      Article #2,

      Page 162 Kunstwadl

      Die “Roland-Medal”
      Als 1980 der Flugabwehrraketenpanzer Roland in die Heeresflugabwehrtruppe eingeführt wurde, konnten den Einheiten jährlich nur zwei Flugcörper zum Verschuss im Rahmen der Jahresscheißen Freigegeben werden. Dieser sehr restriktive Ansatz war zwar erforderlich, um den Bestand an Flugkörpern zu schonen, führte aber dazu, dass statistisch jeder Kommandant und jeder Richtschütze nur einmal in seiner Dienstzeit zum Schuss kommen durfte. Wie sollte darüber Buch gefürht werden? Die lösung war kleidsam: Den Soldaten wurde direkt nach ihrem Schuß ein kleinesnAbzeichen - Die “Roland-Medal” - überreicht, das sie an ihrem Barett tragen durften und das auch von “strengen” Vorgesetzten als plakativer Tätigkeitsnachweis toleriert wurde. Als später jählich bis über 200 Flugkörper in der Ausbildung verschossen wurden, bleib das Abzeichen als Ausdruck einer herausragenden Ausbildungserfahrung.
      Oberstleutnant a. D. H.-G. Behrendt ist Redakteur im Report Verlag und war während siener aktiven Dienstzeit in mehreren Funktionen von 1975-2000 im Management des Waffensystems Roland tätig.


      The "Roland Medal"
      When in 1980 the anti-aircraft missile tank Roland was introduced into the army anti-aircraft force, the units could release annually only two FkaRakPaz units for firing during the annual shoot. Although this very restrictive approach was needed to protect the stock of missiles, it led to statistically each commander and each gunner only once was allowed in his service to shoot a missle. How should this activity be recognized? The solution was dressy: the soldiers were given a small badge - the "Roland Medal" - which they were allowed to wear on their beret and which was also tolerated by "strict" superiors as a striking proof of activity. Later, when more than 200 missiles were shot in training later in the year, the badge remains an expression of outstanding training experience.
      Lieutenant Colonel a. D.H.G. Behrendt is editor of the Report Verlag and worked during his active service in several functions from 1975-2000 in the management of the weapon system Roland.
      Attached Files

      Comment


        #4
        The "medal" in wear on the Bundeswehr Heer beret.
        Attached Files

        Comment


          #5
          Article #3 on the Roland Weapon System


          Roland (missile)

          Type Surface-to-air missile
          Production history
          Manufacturer Euromissile
          Specifications
          Weight 67 kg
          Length 2.40 m
          Diameter 16 cm
          Warhead 6.5 kg (14.3 lb) pre-fragmented high-explosive
          Engine
          Dual-thrust solid-fueled rocket:
          Booster: "Roubaix" rocket, 15.3 kN for 1.7 s
          Sustainer: "Lampyre" rocket, 1.96 kN for 13.2 s
          Wingspan 50 cm
          Operational
          range
          8,000 m
          Flight altitude 5,500 m
          Speed Mach 1.6
          Guidance
          system
          tracking radar

          The Roland is a Franco-German mobile short-range surface-to-air missile (SAM) system. The Roland was also purchased by the U.S. Army as one of very few foreign SAM systems.
          Roland was designed to a joint French and German requirement for a low-level mobile missile system to protect mobile field formations and fixed, high-value targets such as airfields. Development began in 1963 as a study by Nord Aviation of France and Bölkow of Germany with the system then called SABA in France and P-250 in Germany. The two companies formed a joint development project in 1964 and later (as Aérospatiale of France and MBB of Germany) founded the Euromissile company for this and other missile programs. Aerospatiale took primary responsibility for the Roland 1 day/clear-weather system while MBB took primary responsibility for the Roland 2 all-weather system. Aerospatiale was also responsible for the rear and propulsion system of the missile while MBB developed the front end of the missile with warhead and guidance systems. The first guided launch of a Roland prototype took place in June 1968, destroying a CT-20 target drone and fielding of production systems was expected from January 1970. The test and evaluation phase took much longer than originally anticipated with the clear-weather Roland I finally entering operational service with the French Army in April 1977, while the all-weather Roland II was first fielded by the German Army in 1978 followed by the French Army in 1981. The long delays and ever-increasing costs combined with inflation meant Roland was never procured in the numbers originally anticipated.
          Variants
          The Roland SAM system was designed to engage enemy air targets flying at speeds of up to Mach 1.3 at altitudes between 20 meters and 5,500 meters with a minimum effective range of 500 meters and a maximum of 6,300 meters. The system can operate in optical or radar mode and can switch between these modes during an engagement. A pulse-doppler search radar with a range of 15–18 km detects the target which can then be tracked either by the tracking radar or an optical tracker. The optical channel would normally be employed only in daylight against very low-level targets or in a heavy jamming environment.
          The Roland missile is a two-stage solid propellant unit 2.4 meters long with a weight of 66.5 kg including the 6.5 kg multiple hollow-charge fragmentation warhead which contains 3.5 kg of explosive detonated by impact or proximity fuses. The 65 projectile charges have a lethal radius of 6 meters. Cruising speed is Mach 1.6. The missile is delivered in a sealed container which is also the launch tube. Each launcher carries two launch tubes with 8 more inside the vehicle or shelter with automatic reloading in 10 seconds.
          For defence of fixed sites such as airfields the shelter Roland can be integrated in the CORAD (Co-ordinated Roland Air Defense) system which can include a surveillance radar, a Roland Co-ordination Center, 8 Roland fire units and up to 8 guns.
          Fire units
          Roland 1 – The initial fair-weather, daylight-only, version used by the French and Spanish armies on the AMX-30R chassis with entry into service in 1976. Roland 1 can also fire the Roland 2 and Roland 3 missiles.
          Roland 2 – This is the all-weather version mounted on the AMX-30R chassis (France and others), the Marder chassis (Germany, FlaRakPz 1, Heer, and others) and also as a shelter mount in either a static location or mounted on a 6×6 or 8×8 all-terrain truck (Germany, Roland FRR, Luftwaffe and Bundesmarine, and others). Euromissile, MaK, IBH and Blohm and Voss of Germany in 1983 proposed the Leopard 1 tank chassis as a carrier for the Roland system to appeal to those countries who already used the Leopard I tank. Roland 2 can also fire the Roland 3 missile.
          American Roland – Selected in 1975 as the forward air defence system for U.S. Army divisions, the first missiles were delivered in 1977 with the first firing from the XM975 launcher vehicle (a modified M109 howitzer chassis) taking place in September 1978. American Roland was essentially Roland 2 with a longer-ranged American-made search radar. The palletized fire unit could be installed and rapidly removed from the XM975 chassis, installed on a truck or used as a static emplacement. Problems with technology transfer and rising costs (ostensibly at least, institutional resistance within the U.S. Army/DOD and Congress to using a 'foreign' weapons system may have actually played more of a role killed the program and only 27 fire units and 600 missiles were built for one battalion in the Army National Guard, mounted on M812 flatbed trucks. With the failure of the M247 Sergeant York the U.S. Army leased 5 German Roland systems for evaluation as a possible replacement.
          Paladin - Paladin was the Hughes/Euromissile submission for the US Army's Line of Sight, Forward-Heavy requirement. It proposed using the XM957 for trials, with production vehicles to use the Bradley chassis.
          Roland 3 – As part of the development process for the Roland 3 missile, Euromissile developed an upgraded launcher with 4 ready to fire missiles.
          Glaive - Glaive was a Franco-German programme under which Euromissile would develop a revised Roland fire unit for use with the RM5 missile. This would add an integrated thermal sighting system with laser rangefinder allowing for night/all-weather operation without using the radar. Contracts were issued in 1989 with the system intended to enter service in 1996. However, development of RM5 was cancelled in 1991.
          Roland M3S (upgrade) – This system was an upgrade of existing French Roland 1/2 systems to maintain them in service through 2010. It included fitting the BBKS operator consoles and replacing the existing optical sight with the Glaive thermal imaging unit. France had a requirement to update 54 AMX30-based fire units and 20 shelter units with this new equipment. The upgraded fire unit could user either the existing Roland missile or the new Roland 3 missile.
          Roland CAROL - Conversion of existing French Roland 2 systems into a shelter-mounted version of the M3S standard. France procured 20 trailer-borne systems. France intended the shelterised variants for use with air-transported rapid-deployment forces. The upgraded fire unit could user either the existing Roland missile or the new Roland 3 missile.
          Roland LVB - LVB, Luftverlastbarkeit, air-transportable. The Luftwaffe acquired 10 truck-mounted versions, similar to Roland CAROL, with integration into the Heeres Flugabwehr Aufklärungs-und Führungssystem (HFLaAFüSys) air-defence command and control system. As with France, Germany intended the shelterised variants for use with air-transported rapid-deployment forces. The upgraded fire unit could user either the existing Roland missile or the new Roland 3 missile.
          Roland NDV - NDV, Nutzungs Dauer Verlängert, Extended Service Life. This was a German parallel to the French M3S, being developed by LFK GmbH for the German government. The control system was to be digitized and integrated into the HFLaAFüSys air-defence command and control system, with Roland 3 missile integration. Germany had a requirement to upgrade 84 Army (FlaRakPz 1A2) and 40 Luftwaffe (FlaRakRad) fire units. Trials had been completed in 2003 when Germany decided to withdraw Roland from use.
          Roland M3S (new build) - The prototype for this next-generation Roland system was completed in 1992 and was offered to meet the air defence requirements of Turkey and Thailand. The prototype was a shelter installed on the chassis of the American M270 Multiple Launch Rocket System and featured a then Dassault Electronique Rodeo 4 or a Thomson CSF (now Thales) search radar. Roland M3S can be operated by one man although 2 are necessary for sustained operation and the operator can select radar, TV or optronic (FLIR) tracking. Roland M3S has 4 instead of 2 missile containers in the ready-to-fire position but only the 2 lower positions can be automatically reloaded. In addition to the original Roland missile Roland M3S could use the Roland 3 missile, or the VT1 missile of the Crotale missile system. Additionally the upper launch containers could be replaced by 2 pairs of launchers for the Mistral missile or the standard Roland missile container could be adapted to carry four FIM-92 Stinger missiles to increase the system's ability to rapidly engage multiple targets in a saturation attack.
          Roland MX/Jason - From 1969 Euromissile studied Roland as a possible naval weapon for shipboard installation. Originally known as Roland MX and later as Jason, the standard twin launcher (without search radar) with two below-decks 8-round reloading drums could be installed on a standard sized module that was featured in several Blohm & Voss MEKO frigate proposals of the 1970s. No prototype or production systems were built with attention turning early on to an abortive vertically launched missile.
          Missile variants
          Roland 1/2 - The initial missile for the Roland system, entering production in 1977. Roland has a speed of 550 m/s and a range of 6.2 km. Roland 1 and 2 missiles have identical statistics but differ in tracking modes, Roland 1 being optically tracked, while Roland 2 missiles incorporate a continuous wave beacon to allow automatic radar tracking.
          Roland 3 – An upgraded missile which entered production in 1988 with speed increased from 550 m/s to 620 m/s and range increased from 6.3 to 8.5 km with maximum effective altitude increased to 6,000 m. Warhead size is also increased to 9.1 kg with 84 hollow-charges. Response time for the first target is quoted as 6–8 seconds with 2–6 seconds for subsequent targets. The Roland 3 missile can be used by all Roland systems.
          Roland RM5 (Roland Mach 5) – This was a joint project between the then Matra and Aerospatiale of France and MBB of Germany begun in 1987 for a missile with increased speed and range. RM5 was designed to achieve speeds of 1,600 m/s (Mach 5.0) with the range increased to 10 km. The RM5 warhead had an 11 kg warhead with dual detonation modes, able to produce either large, high energy fragments for use against armoured targets, or larger numbers of smaller fragments for use against small targets. The companies had committed to only the preliminary design phase and when Germany and France opted not to fund full scale development in 1991 development of RM-5 ceased.
          VT1 – In September 1991 Euromissile and the then Thomson CSF (now Thales) agreed to integrate the VT1 missile of the Crotale NG system into the Roland 3 system with retrofitting of French and German Roland fire units from 1996. Thales subsequently revoked the Euromissile license, but was ordered to pay Euromissile $109m in a subsequent court case.
          HFK/KV - HFK/KV was a BGT proposed alternative to VT1. It was a hypersonic missile with a speed of over Mach 5, intended to reach maximum range of 12 km in only 60% of the time taken by VT1. Guidance was to be inertial with terminal infra-red homing.
          Current systems are capable of launching Roland 2, Roland 3 or VT1 missiles. Roland's latest upgraded versions have limited ability to counter incoming low RCS munitions (large-caliber heavyweight rockets).
          Carriers

          The Roland system has been installed on a variety of platforms, among them:
          Tracked
          AMX 30
          Marder
          Wheeled
          ACMAT 6×6
          MAN 6×6, 8×8
          Roland 2 was proposed in the early 1980s for installation on the Leopard 1 tank chassis, probably to meet an expected Dutch army requirement but was never built. In configuration it would have been very similar to the AMX-30R.
          American Roland on the M109 chassis was built in prototype form but production systems were rather hastily installed on 6×6 flatbed trucks. In the late 1980s there was an attempt to revive the American Roland program with the Paladin submission to the U.S. Army's LOS-F-H (Line Of Sight - Forward - Heavy) battlefield air defense program. This new version of the American Roland system would have used the existing XM975 vehicle for testing & evaluation purposes, with production systems being fitted on a new modified M2 Bradley chassis.
          An airliftable shelter named Roland CAROL has also been developed, which is a 7.8t container that can be deployed on the ground to protect fixed assets like airfields or depots or fitted on an ACMAT truck.
          Users
          Initial French requirements were for 144 Roland 1 and 70 Roland 2 systems with 10,800 missiles for the French Army, all installed on the AMX-30 tank chassis known as the AMX-30R. 181 systems (83 Roland 1 and 98 Roland 2) were eventually procured. The French Army has subsequently converted 20 of its Roland 2 all-weather systems to the Carole air-mobile shelter mounted system. These are used by the 54th Roland Regiment of the French Reaction Force for rapid deployment on short notice anywhere in the world. Three of the four Artillery Regiments which operated Roland have been disbanded and the 4th (54 Regiment) has been converted to the Mistral (missile). Thus it is likely Roland has been withdrawn from French service.
          Germany was to buy 12,200 missiles 340 Roland 2 fire units installed on the Marder (IFV) chassis to fully replace the towed Bofors 40 mm guns systems and Contraves Super Fledermaus fire control systems in service with the Bundeswehr Corps-level air defense regiments. Each regiment would have 36 fire units in 3 batteries of 12. Eventually 140 fire units were procured and equipped 3 regiments with one assigned to each army corps. The Luftwaffe had a requirement for 200 Roland 2 shelter systems mounted on MAN 8×8 trucks for the close-in defence of airfields and as mobile gap-fillers for the MIM-23 HAWK SAM systems. 95 systems were eventually procured from the mid-1980s with 27 of those used to defend American air bases in Germany. In 1998–99 10 Roland LVB systems were installed on MAN 6×6 trucks to be air-transportable in the Transall C-160 for the German rapid reaction forces. The German Navy also procured 20 truck-mounted shelter systems for defence of naval bases. In February 2003 the Bundeswehr cancelled a planned upgrade of Roland and announced it would phase-out all of its Roland systems. This was completed by the end of 2005. The Luftwaffe and Navy have also withdrawn Roland and it is no longer employed by Germany. The German Army will replace Roland with the new and much more capable development: LFK NG). A battery of German systems have been passed on to Slovenia.
          On January 9, 1975 the United States Army selected Roland 2 as the winner of its SHORADS (Short-Range Air Defense System) competition to replace the MIM-72 Chaparral and M163 VADS divisional air defense systems with a requirement for more than 500 fire units to be designated the MIM-115. Hughes Aircraft and Boeing Aerospace were contracted to develop American Roland which would have been installed in a removable module on the M109 howitzer chassis. The American system used the European fire control system with an American search radar of greater range and enhanced ECCM capability. Initial production of fire units to equip 4 battalions and 1,000 missiles (against an anticipated requirement for 14,000) was approved in October 1978 but subsequently reduced to just 1 battalion. Difficulties in technology transfer, integration and commonality difficulties and rising costs meant only a single Army National Guard battalion was ever equipped with the type with the 27 launchers and 600 missiles installed on 6×6 flatbed trucks instead of tracked carriers. The XMIM-115 was never type-classified and served for less than a decade, being retired in 1988.
          Argentina purchased 4 Roland shelter-mounted systems for static defence of fixed installations and one of these was deployed to defend Stanley airfield during the Falklands War with Britain in 1982. This system fired 8 out of the 10 missiles it was deployed with and is credited with shooting down one Royal Navy Sea Harrier Jump Jet and two 1000lb General-purpose bombs. This system was captured intact by the British and taken back to Britain.
          Brazil purchased 4 Roland 2 systems on the German Marder chassis along with 50 missiles, all of which were retired from service in 2001.

          The Marder-Roland units bought by the Brazilian Army in the late '70s were retired in 2001 and are now on display at Museu Militar Conde de Linhares in Rio de Janeiro, Brazil.
          Venezuela purchased 6 Roland 2 shelter mounted systems although some sources at the time indicated 8 systems.
          Nigeria acquired 16 Roland 2 systems on the AMX-30R chassis. An option for a further 16 was not taken up.
          Spain acquired 9 Roland 1 and 9 Roland 2 systems on the AMX-30R chassis and 414 missiles for defence of its armoured field formations equipping the 71st Air Defence Regiment. Each battery has 2 Roland 1 and 2 Roland 2 systems with one system of each type held for tests and training.
          Iraq is believed to have received 100 shelter-mounted Roland 2 on MAN 8×8 trucks and 13 self-propelled systems on the AMX-30R chassis during the 1980–88 Iran–Iraq war and they first went into action in 1982 claiming a F-4E Phantom and F-5E Tiger that year. Roland is believed to have shot down 2 Panavia Tornado aircraft during Operation Desert Storm and an A10 Thunderbolt during the Iraq war. As a result of Operation Desert Storm in 1991 and Operation Iraqi Freedom in 2003 these systems may no longer be in service.
          In 1986 Qatar ordered 3 self-propelled Roland 2 systems on the AMX-30R chassis and 6 shelter-mounted systems with deliveries completed in 1989.
          Combat use
          On 1 June 1982, during the Falklands War, Sea Harrier nº XZ456 was shot down south of Stanley by members of the GADA 601, an Argentine antiaircraft unit deployed in the area. The launcher, one of four examples delivered to Argentina, was captured in fairly intact condition by the British around Port Stanley after the surrender. It was taken back to Britain as a valuable prize and studied in detail.[citation needed] It is believed that an Iraqi Roland missile succeeded in shooting down an American A-10 Thunderbolt II at the beginning of the Iraq War, during the battle of Baghdad.
          Rolandgate
          In October 2003, controversy erupted between Poland and France when Polish forces from the Multinational force in Iraq found four French Roland surface-to-air missiles. Polish and international press reported that Polish officers claimed these missiles had been manufactured in 2003. France pointed out that it had never sold weapons to Iraq after July 1990 in violation of the embargo. Polish authorities would later remark that the four missiles were manufactured in 1984, and that the 2003 date was the last time when Iraqi personnel had serviced them. Investigations by the Polish authorities came to the conclusion that the persons responsible for the scandal were low level commanders. Wojskowe Służby Informacyjne, the Polish Army's intelligence unit, had not verified their claims before they were leaked to the press. Poland apologized to France for the scandal, but these allegations against France worsened the already somewhat strained relationships between the two countries. The entire incident was sarcastically called "Rolandgate" by the Polish media, using the unofficial naming conventions of US political scandals after Watergate.

          Comment

          Users Viewing this Thread

          Collapse

          There is currently 1 user online. 0 members and 1 guests.

          Most users ever online was 10,032 at 08:13 PM on 09-28-2024.

          Working...
          X